Document Feedback - Review and Comment
Step 1 of 4: Comment on Document
How to make a comment?
1. Use this to open a comment box for your chosen Section, Part, Heading or clause.
2. Type your feedback into the comments box and then click "save comment" button located in the lower-right of the comment box.
3. Do not open more than one comment box at the same time.
4. When you have finished making comments proceed to the next stage by clicking on the "Continue to Step 2" button at the very bottom of this page.
Important Information
During the comment process you are connected to a database. Like internet banking, the session that connects you to the database may time-out due to inactivity. If you do not have JavaScript running you will receive a message to advise you of the length of time before the time-out. If you have JavaScript enabled, the time-out is lengthy and should not cause difficulty, however you should note the following tips to avoid losing your comments or corrupting your entries:
-
DO NOT jump between web pages/applications while logging comments.
-
DO NOT log comments for more than one document at a time. Complete and submit all comments for one document before commenting on another.
-
DO NOT leave your submission half way through. If you need to take a break, submit your current set of comments. The system will email you a copy of your comments so you can identify where you were up to and add to them later.
-
DO NOT exit from the interface until you have completed all three stages of the submission process.
(1) This Procedure aims to ensure Southern Cross University (SCU) management, employees, students, and others understand the risks associated with plant and equipment in the workplace and the risk management strategies adopted by the University. (2) This Procedure applies to all SCU Work Units and sites. All SCU workers and students must comply with the requirements of this Procedure. (3) This Procedure is to be read and applied in conjunction with the WHS Act, WHS Regulation, applicable Codes of Practice, and other SCU WHS procedures. Where the expectations set out in this Procedure exceed the current operational capacity of SCU, a risk-based and staged implementation approach will apply. Responsibilities are assigned in accordance with WHSMP13 and must be actively monitored to ensure compliance. (4) SCU minimises the risks arising from the use of plant and equipment by: (5) This Procedure does not cover plant that rely exclusively on manual power for their operation and are designed to be primarily supported by hand, such as a screwdriver. (6) This Procedure does not cover the selection and guidance for using personal protective equipment (PPE). (7) Consultation regarding physical safety and security will be aligned with the WSHMP07: Consultation, Communication and Participation. (8) SCU will, so far as is reasonably practicable, ensure the provision of information, training, instructions, or supervision necessary to protect all persons from risks arising from work carried out as part of the conduct of SCU business. (9) SCU supervisors and operators are responsible for familiarising themselves with all associated documentation (e.g., operator manuals) to ensure the safe operation of plant and equipment. (10) Where a Work Unit intends to acquire plant or equipment, the responsible person must: (11) SCU will ensure that registrable plant is identified and appropriately registered in accordance with WHS Regulation Schedule 5. Where SCU has management or control of a registrable plant, the person responsible must obtain a copy of the design registration and consult WHS to verify the registration status. (12) The Plant shall be positioned so: (13) A plant purchased directly from overseas is assessed for suitability for use in Australia before purchase. Attention to the operating voltage and frequency ranges is essential (particularly in the case of three-phase equipment, whether the rated voltages refer to phase-to-phase or phase-to-neutral connection). If the frequency is incorrect, some devices within the plant may overheat, lose time, or otherwise fail. (14) All plant must be commissioned by a competent person before operation. The responsible Work Unit must: (15) Where the responsible person initiates modification or alteration to an item of plant or equipment, they must ensure: (16) Operating procedures must be documented for plant equipment as per the SCU Safe system of work. These procedures should be based on manufacturer guidance and local risk assessment, where reasonably practicable. (17) A low-risk or hand-held plant may be managed through general safe work practices unless a higher risk is identified. (18) The responsible Work Unit must: (19) The makeup of guarding must comprise the following: (21) The person responsible for the management and control of the powered mobile plant at SCU workplaces must manage the risks to health and safety associated with: (22) SCU must ensure that emergency stop controls of SCU controlled plant are: (23) Warning devices need to be positioned on the plant when the moving plant is likely to collide with another plant or workers nearby. The following is an example of warning devices: (24) The person who operates an item of plant or equipment must have the necessary competencies and/or licences before operating an item of plant or equipment. Plant or equipment, such as forklifts, scaffolding, pressure equipment, and some types of cranes, is identified in the WHS Regulations as plants or equipment that require a high-risk work licence. (25) Spotters must be assigned where required by risk assessment or under Permit to Work. They must: (26) Refer to HRP22: Lock Out, Tag Out. (27) All plant must be maintained according to manufacturer specifications, or where not available, as a competent person advises. All service and inspection records must be recorded. (28) Where a plant is removed from use for decommission, maintenance, or cleaning, energy sources must be isolated according to HRP22: Lock Out Tag Out. If isolation is not possible, alternative measures must be documented and risk assessed. (29) When the plant is to be decommissioned or demolished, it must be carried out by a competent person. Some plant may contain hazardous materials. The person responsible is to inspect the plant or review any necessary documentation, including hazard assessments and manufacturer guidelines. The inspection will occur in the planning stage before decommissioning, dismantling, and disposal to identify hazardous materials. Contact the WHS team and your local regulator for further guidance if hazardous materials are suspected. (30) Refer to WHSMP13: Responsibility and Accountability Statement. (31) All relevant documentation will be recorded and kept in accordance with WHS Legislation and other legislative obligations. (32) This procedure will be reviewed as per nominated review dates or because of other events, such as: HRP04: Plant and Equipment
Section 1 - Purpose and Scope
Section 2 - Definitions
Top of Page
Section 3 - General Principles
Limitations
Consultation
Information, Instruction and Training
Acquisition, Purchase or Hire of Plant
Plant Registration
Positioning of the Plant in the Workplace
Commissioning
Modification and Alterations to Plant and Equipment
Operating Procedures
Guarding Plant
Operational Controls
Powered Mobile Plant
Emergency Stops
Warning Devices
High-risk Work Licences
Spotter Safety
Maintenance, Repair, and Cleaning
Isolation/Tagout
Decommissioning, Dismantling and Disposal
Section 4 - Roles and Responsibilities
Section 5 - Records of Documentation
Section 6 - Revision and approval history
Top of PageSection 7 - References
Section 8 - Related Documents