Document Feedback - Review and Comment
Step 1 of 4: Comment on Document
How to make a comment?
1. Use this
to open a comment box for your chosen Section, Part, Heading or clause.
2. Type your feedback into the comments box and then click "save comment" button located in the lower-right of the comment box.
3. Do not open more than one comment box at the same time.
4. When you have finished making comments proceed to the next stage by clicking on the "Continue to Step 2" button at the very bottom of this page.
Important Information
During the comment process you are connected to a database. Like internet banking, the session that connects you to the database may time-out due to inactivity. If you do not have JavaScript running you will receive a message to advise you of the length of time before the time-out. If you have JavaScript enabled, the time-out is lengthy and should not cause difficulty, however you should note the following tips to avoid losing your comments or corrupting your entries:
-
DO NOT jump between web pages/applications while logging comments.
-
DO NOT log comments for more than one document at a time. Complete and submit all comments for one document before commenting on another.
-
DO NOT leave your submission half way through. If you need to take a break, submit your current set of comments. The system will email you a copy of your comments so you can identify where you were up to and add to them later.
-
DO NOT exit from the interface until you have completed all three stages of the submission process.
(1) This Procedure aims to ensure Southern Cross University (SCU) management, employees, students, and others know the risks associated with electrical safety in the workplace and relevant management strategies for the risk mitigation process. (2) All employees, students, and others must follow this Procedure. (3) This Procedure applies to all SCU Work Units and sites. (4) SCU will follow the risk management process outlined in WHSMP02: Hazard Identification, Risk and Opportunity Management Procedure. This process includes: (5) Consultation is critical for effective risk management and is outlined in WHSMP07: Consultation, Communication and Participation. (6) SCU minimises the risks of exposure to electricity or electrical equipment for employees, students, and visitors to workplaces by ensuring that: (7) Workers must follow the manufacturer’s instructions and safe work procedures when using electrical equipment. (8) Electrical risks include but are not limited to death, shock, or other injury caused directly or indirectly by electricity. The most common electrical risks and causes of injury are: (9) Electric shocks may also lead to other injuries, including falls from ladders, scaffolds, or other elevated work platforms. Other injuries or illnesses may include muscle spasms, palpitations, nausea, vomiting, collapse, and unconsciousness. (10) Faulty electrical equipment and poor electrical installations can lead to fires that may also cause death or injury to others. (11) Electrical cords must be secured safely so they are not a trip hazard and cannot be accidentally damaged. (12) Any unsafe electrical equipment at the workplace must be disconnected or isolated from its electricity supply. It is not to be reconnected until it is repaired or tested by a competent person and found safe, replaced or permanently removed from use. (13) Electrical equipment must be regularly inspected and tested if used in environments that expose it to moisture, heat, vibration, mechanical damage, corrosive chemicals or dust. (14) Lower risk workplaces: equipment tested at least every 12 months. (15) Higher risk workplaces: equipment tested at least every six months (16) All tested equipment must be tagged with compliant labels in accordance with WHS legislation and AS3760. (17) Power points must be switched off before an electrical plug is removed from the socket to reduce the risk of electric shock or fire. Plugs must not be removed by pulling the cord. (18) Where a worker identifies any evidence that the cord, plug, or equipment is damaged, they must remove the equipment/isolate the socket and immediately place an Out of Service Tag, report with Riskware hazard report, and submit an Archibus report. (19) Double Adaptors must not be used under any circumstances in SCU facilities. (20) Power boards are permitted under the following conditions: (21) Extension leads are permitted under the following conditions: (22) Residual Current Devices (RCDs) must be installed and used in accordance with AS/NZS 3000. (23) RCDs must be tested regularly in accordance with AS/NZS 3760 and records of testing maintained. (24) Besides the above, any work that involves cutting, coring, drilling, penetrating, removing, or resurfacing floors, slabs, walls, or ceilings must follow the Concealed Services Clearance Protocol before work commences. (25) The Concealed Services Clearance Protocol includes: (26) If concealed or undocumented electrical services are located or suspected, work must not proceed until risk controls are implemented in accordance with HRP22: Lock Out Tag Out, including isolation, tagging, barricading, or removal from service where required, and the risk must be escalated to the Property Services department. (27) Legacy infrastructure (e.g., abandoned cables, undocumented systems) must be treated as a potential live risk until proven otherwise by a competent person. These findings must be logged into the Site Electrical Register and reported through the appropriate SCU system (e.g., Riskware or Archibus). (28) All SCU electrical equipment must be recorded in a register. (29) The register must include location, commissioning date, tester’s name, test date, outcome, and next test date. (30) Equipment must be tagged with tester’s details, test date, outcome, and next due test. (31) Inspection and testing must be carried out by a competent person with the required skills, qualifications, experience, and test instruments. (32) Testing requiring dismantling must only be carried out by a licensed electrician. (33) Contractors must have all equipment inspected, tested, and tagged before bringing it onsite and provide evidence when requested. (34) New equipment must be visually inspected before use and tagged with in-service date. (35) Hired or leased equipment must be inspected, tested, and tagged prior to supply. (36) Workers/contractors must visually inspect cords and plugs prior to use, ensure equipment is dry, not touched with wet hands, and within test/tag date. (37) SCU will provide competency training through an RTO to maintenance employees required to complete electrical works. (38) All trade workers shall receive training in isolation and lockout procedures. (39) Contractors and sub-contractors must be trained in lockout procedures and SCU requirements. (40) Contractors must meet licensing requirements and provide evidence prior to work. (41) Authorised electrical workers and contractors must hold valid licences and be trained and competent for the work. (42) WHS Regulations and Electrical Safety Regulations prohibit work on energised (live) electrical equipment unless one or more of the exceptions under the WHS Regulations apply (see WHS Regulation 158). It is insufficient to conduct live electrical work simply because it is more convenient than isolating and de-energising. (43) Refer to the Code of Practice: Managing Electrical Risks in the Workplace in the relevant jurisdiction for more information on the few circumstances under which testing live is permitted and how it should be carried out. (44) Where energised work is permitted under Regulation 158: (45) Electrical work on energised electrical equipment is prohibited. Before electrical work is carried out, a competent person must test it to ensure it is not energised. All precautions must be taken to prevent de-energised equipment from being inadvertently re-energised by isolating and locking out circuits/equipment intended to be worked on. Refer to HRP22 Lock/tag out Procedure. (46) De-energised testing methods should be used before energised testing methods. Fault finding should first be attempted in a de-energised environment using de-energised testing methods. If unsuccessful, energised testing methods may be used, subject to meeting the requirements of the WHS Regulation for working energised. (47) Where concealed services are suspected, HRP22 Lock Out Tag Out procedures must be followed as a precaution until confirmation of de-energisation is achieved (48) Controls must be in place to prevent unauthorised access to equipment while it is being repaired or maintained. Controls may include locked access, barricading, and signage at entry to notify SCU employees, contractors, students, and others of the electrical hazards. (49) Lockouts or isolation principles are designed to either isolate or prevent the use of specific equipment or systems. This may be because the equipment is not working correctly and poses a danger to staff and/or others in public access areas. Refer to HRP22 Lock/tag out Procedure. (50) Working on live equipment should be avoided at all times. Suppose testing or fault finding on live equipment is necessary. In that case, testing shall be carried out by a competent person only and per the WHS Regulations for energised electrical work. (51) If work is left unfinished, you must ensure that the workplace is safe so far as is reasonably practicable. For example: (52) A safe system of work will be applied to electrical work, which may include risk assessment, Safe Work Instruction (SWI), and Task Hazard Analysis (THA). (53) PPE (such as eyewear, insulated gloves, hard hats, aprons, breathing protection) must comply with Australian Standards and protect against maximum expected energy levels when working on or near energised equipment. (54) Any work on high-voltage electrical installations must: (55) All tools and equipment must be fit for purpose, maintained, and used appropriately. (56) Examples include insulated tools, non-conductive ladders, insulating mats, calibrated testers, temporary covers, safe ladder placement, PPE, and safe management of conductive items. (57) SCU must provide and maintain all equipment required for first aid and low-voltage rescues. (58) Sufficient numbers of workers must be trained in first aid and rescue equipment use. (59) All electrical workers must complete Low Voltage Rescue (LVR) and CPR training through a Registered Training Organisation. (60) LVR and CPR training must be refreshed every 12 months. (61) All issues, faults, and/or damage to SCU electrical infrastructure and equipment must be reported in the SCU Maintenance Management System. (62) All incidents, near misses, and hazards relating to electrical work and equipment must be reported in Riskware. (63) The WHS team will notify the regulator of a notifiable serious electrical injury or illness of a person or dangerous electrical incident. (64) Refer to WSHMP13: Responsibilities and Accountability Statement. (65) All relevant documentation will be recorded and kept in accordance with WHS Legislation and other legislative obligations, including: (66) Records of risk assessments, Energised Electrical Work Permits, isolation records, training evidence, and associated SWMS must be retained for a minimum of five (5) years from the date the work was carried out. Records relating to incidents, investigations, and corrective actions must also be retained for at least five (5) years, or longer if required by legislation or SCU policy. These records must be securely stored and made available for inspection by regulators or auditors upon request. (67) This Procedure will be reviewed as per nominated review dates or because of other events, such as: HRP07: Electrical Safety
Section 1 - Purpose and Scope
Section 2 - Definitions
Top of Page
Competent person test and tag ,RCD testing
Section 3 - General Principles
Part A - Hazard Identification
General Safety Principles
Electrical Risks
Unsafe Electrical Equipment
Hazardous Environments
Workplace Classification
Specific Hazardous Practices
Power Points
Double Adaptors and Power Boards
Extension Leads
Safety Switches / Residual Current Devices (RCDs)
Concealed Services & Legacy Infrastructure
Part B - Risk Assessment
Testing and Tagging
Competency of Inspectors/Testers
New and Hired Equipment
Part C - Risk Control
Information, Instruction and Training
Licence Requirements
Work Methods
Working Energised
Working De-energised
Restricted Access
Lock Out Principles
Altering Isolation for Testing, Fault Finding, and Re-energising
Leaving Unfinished Work
Safe Work Procedures
Personal Protective Equipment (PPE)
High Voltage Work
Tools and Equipment
First Aid and Rescue
Rescue and Resuscitation Training
Part D - Review of Control Measures
Reporting
Section 4 - Responsibilities
Section 5 - Records of Documentation
Section 6 - Revision and Approval History
Top of PageSection 7 - References
Related Documents