(1) This Procedure aims to ensure Southern Cross University (SCU) management, employees, students, and others understand the risks associated with plant and equipment in the workplace and the risk management strategies adopted by the University. (2) All employees, students, and others must follow this Procedure. (3) This Procedure applies to all SCU Work Units and sites. (4) SCU will follow the risk management process outlined in WHSMP02: Hazard Identification, Risk and Opportunity Management Procedure, this process includes: (5) Consultation is critical for effective risk management and is outlined in WSHMP07: Consultation, Communication and Participation. (6) This Procedure does not cover plant that rely exclusively on manual power for their operation and are designed to be primarily supported by hand, such as a screwdriver. (7) SCU supervisors and operators are responsible for familiarising themselves with all associated documentation (e.g., operator manuals) to ensure the safe operation of plant and equipment. (8) Where a Work Unit intends to acquire plant or equipment, the responsible person must: (9) SCU will ensure that registrable plant is identified and appropriately registered in accordance with WHS Regulation Schedule 5. Where SCU has management or control of a registrable plant, the person responsible must obtain a copy of the design registration and consult WHS to verify the registration status. (10) The Plant shall be positioned so: (11) A plant purchased directly from overseas is assessed for suitability for use in Australia before purchase. Attention to the operating voltage and frequency ranges is essential (particularly in the case of three-phase equipment, whether the rated voltages refer to phase-to-phase or phase-to-neutral connection). If the frequency is incorrect, some devices within the plant may overheat, lose time, or otherwise fail. (12) A documented risk assessment is completed following consultation with the person completing the modifications or alterations. (13) The Work Unit must assess the risks that may arise from using the plant and associated work systems, and ensure that hazards are controlled to an acceptable level. (14) The makeup of guarding must comprise the following: (15) The person responsible for the management and control of the powered mobile plant at SCU workplaces must manage the risks to health and safety associated with: (16) Spotters must be assigned where required by risk assessment or under Permit to Work. They must: (17) When the plant is to be decommissioned or demolished, it must be carried out by a competent person. Some plant may contain hazardous materials. The person responsible is to inspect the plant or review any necessary documentation, including hazard assessments and manufacturer guidelines. The inspection will occur in the planning stage before decommissioning, dismantling, and disposal to identify hazardous materials. Contact the WHS team and your local regulator for further guidance if hazardous materials are suspected. (18) Ensure that relevant work instructions and plant hazard assessments have been completed. (19) A documented risk assessment is completed following consultation with the person completing the modifications or alterations. (20) The responsible Work Unit must: (21) Where a plant is removed from use for decommission, maintenance, or cleaning, energy sources must be isolated according to HRP22: Lock Out Tag Out. If isolation is not possible, alternative measures must be documented and risk assessed. (22) SCU will, so far as is reasonably practicable, ensure the provision of information, training, instructions, or supervision necessary to protect all persons from risks arising from work carried out as part of the conduct of SCU business. (23) Where a Work Unit intends to acquire plant or equipment, the responsible person must: (24) The Plant shall be positioned so: (25) All plant must be commissioned by a competent person before operation. The responsible Work Unit must: (26) Where the responsible person initiates modification or alteration to an item of plant or equipment, they must ensure: (27) Operating procedures must be documented for plant equipment as per the SCU Safe system of work. These procedures should be based on manufacturer guidance and local risk assessment, where reasonably practicable. (28) A low-risk or hand-held plant may be managed through general safe work practices unless a higher risk is identified. (29) The responsible Work Unit must: (30) The makeup of guarding must comprise the following: (31) Operator controls must: (32) The person responsible for the management and control of the powered mobile plant at SCU workplaces must manage the risks to health and safety associated with: (33) SCU must ensure that emergency stop controls of SCU controlled plant are: (34) Warning devices need to be positioned on the plant when the moving plant is likely to collide with another plant or workers nearby. The following is an example of warning devices: (35) The person who operates an item of plant or equipment must have the necessary competencies and/or licences before operating an item of plant or equipment. Plant or equipment, such as forklifts, scaffolding, pressure equipment, and some types of cranes, is identified in the WHS Regulations as plants or equipment that require a high-risk work licence. (36) Spotters must be assigned where required by risk assessment or under Permit to Work. They must: (37) Refer to HRP22: Lock Out, Tag Out. (38) All plant must be maintained according to manufacturer specifications, or where not available, as a competent person advises. All service and inspection records must be recorded. (39) Where a plant is removed from use for decommission, maintenance, or cleaning, energy sources must be isolated according to HRP22: Lock Out Tag Out. If isolation is not possible, alternative measures must be documented and risk assessed. (40) When the plant is to be decommissioned or demolished, it must be carried out by a competent person. Some plant may contain hazardous materials. The person responsible is to inspect the plant or review any necessary documentation, including hazard assessments and manufacturer guidelines. The inspection will occur in the planning stage before decommissioning, dismantling, and disposal to identify hazardous materials. Contact the WHS team and your local regulator for further guidance if hazardous materials are suspected. (41) SCU will ensure that registrable plant is identified and appropriately registered in accordance with WHS Regulation Schedule 5. Where SCU has management or control of a registrable plant, the person responsible must obtain a copy of the design registration and consult WHS to verify the registration status. (42) document the commissioning process. (43) Confirmed by a certificate or equivalent that it works according to design and manufacturers' specifications. (44) Maintenance, isolation, and cleaning procedures for the plant are carried out in compliance with the procedure. (45) Refer to WHSMP13: Responsibility and Accountability Statement. (46) All relevant documentation will be recorded and kept in accordance with WHS Legislation and other legislative obligations. (47) This procedure will be reviewed as per nominated review dates or because of other events, such as: HRP04: Plant and Equipment
Section 1 - Purpose and Scope
Section 2 - Definitions
Top of Page
Section 3 - General Principles
Risk Management Process
Consultation
Limitations
Part A - Hazard Identification
Responsibilities and Familiarisation
Pre-Purchase and Acquisition Requirements
Plant Registration
Positioning and Installation of the Plant
Overseas Purchases – Suitability for Use
Modification and Alterations – Initial Risk Steps
Guarding – General Requirements
Powered Mobile Plant – Key Risks
Spotter Safety
Decommissioning, Dismantling and Disposal – Identification of Hazards
Part B - Risk Assessment
Documentation and Hazard Assessments
Work Unit Duties – Assess and Plan
Isolation During Decommission/Maintenance/Cleaning
Part C - Risk Control
Information, Instruction and Training
Acquisition Controls (Pre-Purchase)
Positioning Controls (Physical Layout)
Commissioning of Plant
Modifications and Alterations – Control Measures
Operating Procedures
Managing Low-Risk/Hand-Held Plant
Work Unit Operational Controls
Guarding – Implementation
Operator Controls
Powered Mobile Plant – Risk Controls
Emergency Stop Controls
Warning Devices
Competency and High-risk Work Licences
Spotter Requirements (Operational Controls)
Isolation and Maintenance Controls
Decommissioning, Dismantling and Disposal – Control Measures
Part D - Review of Control Measures
Registration Verification
Commissioning Records – Documentation
Ongoing Compliance with Procedures
Section 4 - Roles and Responsibilities
Section 5 - Records of Documentation
Section 6 - Revision and approval history
Top of PageSection 7 - References
Section 8 - Related Documents
View Current
This is the current version of this document. To view historic versions, click the link in the document's navigation bar.
Competent Person
A person who has acquired through training, qualification or experience the knowledge and skills to carry out the task.
A competent person has a more specific meaning in the following circumstances:
For design verification, the person must have the skills, qualifications, competence, and experience to design the plant or verify the design.
For inspecting plant for registration purposes, the person must have:
Educational or vocational qualifications in an engineering discipline relevant to the plant being inspected.
Knowledge of the technical standards relevant to the plant being inspected.
For inspecting mobile cranes, tower cranes, amusement devices and passenger ropeways, the person must:
Have the skills, qualifications, competence, and experience to inspect the plant and be registered under a law that provides for the registration of professional engineers in jurisdictions where such a law exists or be determined by the regulator to be a competent person.
Plant
The plant includes machinery, equipment, appliances, containers, implements, tool components, and anything fitted or connected to them. It also includes items as diverse as lifts, cranes, computers, machinery, conveyors, forklifts, vehicles, power tools, quad bikes, mobile plant, and amusement devices.
Plant that relies exclusively on manual power for its operation and is designed to be primarily supported by hand, for example a screwdriver, is not covered by the WHS Regulations. The general duty of care under the WHS Act applies to this type of plant.
Certain kinds of plant, such as forklifts, cranes, and some pressure equipment, require a licence from the regulator to operate, and some high-risk plant must also be registered with the regulator.
Work Health and Safety Act (in the applicable jurisdiction that SCU operates)
Work Health and Safety Regulation (in the applicable jurisdiction that SCU operates)
Managing Risks of Plant in the Workplace Code of Practice. 2011 (QLD) 2022 (NSW)
Top of Page