(1) The purpose of this procedure is to ensure the management of risks associated with purchasing and contractor WHS at Southern Cross University (SCU) are appropriately managed and controlled. (2) The purpose of this procedure is to ensure Southern Cross University’s management, employees, contractors, students, visitors and others are aware of the purchasing and contractor WHS requirements. (3) All employees, students and others including both independent contractors and contractors under SCU control are to be made aware of and follow this procedure. This procedure applies to all SCU employees and Contractors to SCU who provide building, construction and/or maintenance services. It should be applied to any item purchased via orders, tenders, contracts, petty cash and credit card transactions. It does not apply to non-hazardous items such as stationery, office supplies, books, travel, conference and membership fees, accommodation, software, minor hardware and non-hazardous chemicals. (4) This Procedure applies to all SCU Work Units and sites. The procedure aligns with WHS legislation in the relevant jurisdictions SCU operates in. (5) SCU shall coordinate their procurement processes to identify hazards and assess and control WHS risks. (6) The underlying principle of determining WHS requirements before the purchase of items is to ensure that hazards are not introduced into the workplace without consideration and to ensure that any controls needed for the use of the item are in place prior to the item being used in the workplace. (7) Evaluating Hazardous Items: Any hazardous items to be purchased should be evaluated to determine what WHS requirements and controls are needed to ensure that the hazards are controlled prior to the items being used in the workplace. It is much more efficient and less costly to identify safety controls before an item is purchased rather than to wait until it arrives and discover that additional costly control measures are required to use it safely. (8) SCU Procurement Policy: If the item to be purchased is covered by existing risk control measures and meets industry standards, codes of practice, and legislative requirements, then a more detailed risk assessment is not required prior to purchase. The person purchasing the goods must still ensure the goods do not pose a risk to health and safety and check the goods meet any required WHS specifications before the item is used in the workplace. The SCU Procurement Policy outlines the framework for the University's procurement activities including the principles to be applied for the acquisition of all goods and services. (9) Information Gathering: Sufficient information must be sought by the person requesting the goods (not the person raising the purchase order) before new plant or equipment is introduced into the workplace so that the health and safety implications can be assessed in advance. It is necessary to consider impacts such as: (10) A risk assessment can be re-used for repeated purchases of the same item or where the supplier has previously demonstrated compliance with WHS requirements. However, if the use or quantity of the item differs and has a greater impact on health and safety, the risk assessment should be reviewed and modified accordingly. (11) Any proposed changes to the working environment through the purchase of goods and services that could place a risk to health and safety must be consulted with employees who are likely to be affected. This can be achieved by being raised with the supervisor or the SCU Workplace Health and Safety Committee. (12) The SCU Responsible Officer is the primary individual responsible for engaging, liaising with and monitoring the contractor on behalf of the University. The SCU Contractor Safety Procedure outlines the system of work for University Officers charged with overseeing the work of contractors and service providers. (13) Refer to the WHS Responsibility and Accountability Statements (14) During the procurement and engagement of contracted works, the University Officer must establish a contract information record structure within the University’s systems with the correct access controls and keep key contract information updated as described in the University’s Contract Management Framework. (15) All Contractor records must be retained in accordance with the relevant legislation. (16) All relevant documentation will be recorded and kept in accordance with WHS Legislation and other legislative obligations. WHSMP11: Purchasing and Contractor WHS Procedure
Section 1 - Purpose and Scope
Section 2 - Definitions
Top of Page
Section 3 - General Principles
Purchasing
Receipt of Goods and Services
Hazard Identification and Risk Control
Determining WHS Requirements
Purchasing Plant and Equipment
Purchasing Hazardous Chemicals
Repeat Purchases
Consultation
Contractor WHS Requirements
Top of PageSection 4 - Roles and Responsibilities
Section 5 - Records of Documentation
Section 6 - Revision and approval history
Section 7 - Related Documents
SCU Procurement Policy
WHS Responsibility and Accountability Statements
View Current
This is the current version of this document. You can provide feedback on this policy to the document author - refer to the Status and Details on the document's navigation bar.
Contractor
A person or Person Conducting a Business or Undertaking engaged to supply materials, service, labour, professional advice or audit. It does not include ‘Consultants’ subject to separate and specific consultancy agreement clauses.
Stakeholder
Others not classified as contractors but still provide a non-physical service for the University. Such as trainers or event speakers.
Construction Work
Any work carried out in connection with construction, alteration, auditing, renovation, repair, maintenance, demolition, refurbishment, fitting-out or dismantling of a structure.
Hazard
A situation with the potential to harm the health and safety of contractors and others due to works or to damage buildings, plants or equipment.
Incident
An unplanned event that caused, or could have caused, illness or injury to those working onsite or others. This includes “near-miss” events where no injury or illness occurred.
University representative
The nominated University representative responsible for the engagement, management and coordination of the contracted works.
WHSMP15: WHS Audit and Assurance
WHSMP02: Hazard Identification, Risk and Opportunity Management Procedure
Contractor Safety Procedure - https://policies.scu.edu.au/view.current.php?id=00061